South Carolina · SC

South Carolina: a rain log requirement, and we will not oversell it.

Most vendors present South Carolina as a post-storm inspection state. Read SCR100000 and that inspection is recommended, not required. The mandatory piece is the rain log and the weekly report, so that is what we build for.

South Carolina rainfall inspection threshold facts
Rainfall trigger0.50″ — significant rainfall event
Measurement windowRolling 24 hours
What it requiresRain log entry + weekly inspection report
Baseline inspectionEvery 7 days
PermitSCR100000 — SC DES CGP
VerificationPartial — post-storm inspection is recommended, not required
StatusPartial

Defaults we ship, not legal advice. Your individual permit governs, and every threshold is editable per site.

What it means on site

South Carolina specifics we build for

The 0.5 inch event goes in the rain log

A storm of 0.5 inches or more is a significant rainfall event that must be recorded in the site rain log and reported on the weekly inspection report. SWRainAlert logs it automatically, with both NOAA readings and the time it crossed, so the weekly report is assembled rather than reconstructed from memory.

Weekly inspections are the baseline

The seven-day inspection is the requirement that actually binds in South Carolina. It appears here under its own routine purpose with its own form, separate from the storm record.

Sensitive Waters can be stricter

Sites discharging to Sensitive Waters may be required to inspect more frequently than the baseline. Your permit governs — thresholds and frequencies are editable per site, and we would rather you override us than trust a default that does not match your paperwork.

Same everywhere

Two NOAA sources, and we show you both.

Whatever your state's number is, the reading it is compared against matters just as much. We run NOAA Stage IV and NOAA MRMS independently, store both per site, alert on the higher, and flag it when they disagree. Neither is averaged into the other.

  • Evaluated every five minutes, with one notification per transition.
  • Six dry hours close the event, so the second storm of the day gets its own alert.
  • Missing radar reads as unavailable, never as zero rainfall.
  • Deadlines in the site's local time — never assumed, never UTC.
Stage IV reports 0.47 inches and MRMS 0.62 inches for the same site; the higher reading triggers the alert and the gap is flagged as a divergence.
Both readings reach the dashboard and the inspection report.

South Carolina questions

Straight answers

Does South Carolina require an inspection after rain?

SCR100000 recommends a post-storm inspection but does not require one. What it requires is that a rainfall event of 0.5 inches or more be recorded in the site rain log and reported on the weekly inspection report.

Why does SWRainAlert list South Carolina as partial?

Because we have verified the rain-log requirement against the current permit but not every element of the post-storm language, and we would rather label that than present it as settled. You still get the alert; we are careful about what we call it.

Can I still get an alert at 0.5 inches?

Yes. The alert fires and the event is logged. It is described as a rain-log event rather than a mandated inspection deadline.

Not a compliance guarantee. This is a monitoring and recordkeeping aid. Where your permit names an on-site rain gauge as the system of record, the gauge is the record — and the inspector's judgement outranks ours.

Add your South Carolina sites and stop watching the sky.

Thirty days of Complete, every feature, no card.